The vessel was hauled out in April 2015. During this time, the following was completed:
The port generator had a new armature installed. New grid coolers were installed on each port and starboard side
New cutlass bearing installed ,and runouts were done on the shafts.
The propellers were reworked. The fleet deck was added.
New main engine alarm systems were Installed. The galley interior was refurbished. Potable water tanks were cleaned and coated. New anodes were installed on the hull. Rebuilt main engines were installed.