70’x16′ with wooden deck

Hunting/Fishing camp completely gutted and renovated in 2010, bottom blasted and painted.

New 10kw diesel generator in 2012

New Spud Wells 2012

Upstairs completely gutted, re wired and renovated in 2015,

All new carpet upstairs and downstairs in 2015

New Gutter System 2015

New Sanitation System installed 2015

LUS-75 Camp Unit
Approved by the Louisiana
Department of Public Health
as a Limited Use Sewer System

20’x20′ Wooden Deck included

Call for more pictures and information.

rb6

rb7rb10rb11LUS-75-Camp-Unit_mdrb2rb13rb6 rb2 rb3 rb5 rb14

70’x16′ with wooden deck

Hauled out in 2020, bottom water blasted and painted.

Hunting/Fishing camp completely gutted and renovated in 2010, bottom blasted and painted.

New 10kw diesel generator in 2012

New Spud Wells 2012

Upstairs completely gutted, re wired and renovated in 2015,

All new carpet upstairs and downstairs in 2015

New Gutter System 2015

New Sanitation System installed 2015

LUS-75 Camp Unit
Approved by the Louisiana
Department of Public Health
as a Limited Use Sewer System

 

20’x20′ Wooden Deck included

 

Call for more pictures and information.